Let's Get That Pending Article Published To The World
For Adverts and Enquiries
Phone: 234 906 451 4605
Email: triplenetblogs@gmail.com


BREAKING NEWS:

  Abia driver finds N400,000 in bus, tracks down passenger to return cash         CELEBRATING CHIEF (DR.) GABRIEL OSAWARU IGBINEDION, CON @ 92         Young Author Chimamanda publishes book on Menstrual Health         Military rescues 363 victims, arrests scores of terrorists in 1 week – DHQ         Police commences investigation into viral video of alleged assault by officers on a gold seller         Security Situation Room Special Congratulatory Message to Super Cop on His Retirement .         BENIN WRITERS SOCIETY CELEBRATES NKECHI EDOGBO         Eid-el-Kabir Message by Chief Mela Audu Nunghe SAN to the good people of Gombe South and all Muslim faithful         WE ARE IGBO         Poetry Comes Alive in Benin City as Benin Writers Society Celebrates World Poetry Day      

Lagos-Shagamu expressway’s long bridge undergoes repairs March 4 — Federal Controller

The Federal Government has announced that the Lagos-Shagamu Expressway’s Long Bridge will undergo repairs to its damaged expansion joints from Monday.

The Federal Controller of Works in Lagos State, Mrs Olukorede Kesha, disclosed this in a statement on Friday night in Lagos.

Kesha, who regretted the inconvenience that these repairs might cause motorists, appealed for patience and cooperation by members of the public.

“The Federal Ministry of Works wish to inform the motoring public that repair works for the damaged expansion joints on the long bridge will commence by Monday, March 4, 2024, simultaneously on both bounds of the bridge.

“Consequently, traffic leaving and entering Lagos through the long bridge will be narrowed to two lanes on both sides of the bridge to enable the contractor handling the repair works to commence works on the other two lanes of the carriageways.

“Thus, all road users are advised to be patient and adhere to lane discipline on both approaches to the Long Bridge and around the narrowed sections on the bridge.

“The earth road beside the Shagamu bound carriageway will be made motorable, to serve as complimentary road. Other road users are advised to use alternative routes.

“Motorists are further advised to cooperate with the traffic management officials deployed to manage traffic and ensure hitch-free movements to minimise discomfort during the duration of the repair works,” she said.

According to the notification, the repair, which will begin by 7.00a.m. on Monday, will last till March 25

1515

©www.triplenet.com.ng/imetrowatch
All right Reserved